Document Explorer

North York Moors

North York Moors logo
Browse section
Plans Plans
Document Name
pacorr\appage\658681.pdf
pacorr\appage\661121.pdf
pacorr\appage\664222.pdf
pacorr\appage\665628.pdf
pacorr\conslt\658682.pdf
pacorr\conslt\658683.pdf
pacorr\conslt\658684.pdf
pacorr\conslt\661127.pdf
pacorr\conslt\661128.pdf
pacorr\conslt\661129.pdf
pacorr\conslt\664224.pdf
pacorr\conslt\664225.pdf
pacorr\conslt\664226.pdf
pacorr\conslt\665625.pdf
pacorr\conslt\665626.pdf
pacorr\conslt\665627.pdf
public 00 nym2014-0587-eia decision notice.pdf
public 00 nym2014-0587-eia section 65 agreement.pdf
public 01 nym2014-0587-eia committee public speaking guidance note (updated august 2015).pdf
public 01 nym2014-0587-eia committee report (august).pdf
public 01 nym2014-0587-eia committee report (march).pdf
public 01 nym2014-0587-eia committee report (may).pdf
public 02 nym2014-0587-eia additional information part 01 17-02-15.pdf
public 02 nym2014-0587-eia additional information part 02 17-02-15 - rockflow report.pdf
public 02 nym2014-0587-eia additional information part 03 17-02-2015.pdf
public 02 nym2014-0587-eia budget eta and s106 emails 23-02-15.pdf
public 02 nym2014-0587-eia summary of residual effects table revision b 23-02-15.pdf
public 02 nym2014-0587-eia technical note application review 26-02-2015.pdf
public 03 nym2014-0587-eia additional third party comments - 19-08-2015.pdf
public 03 nym2014-0587-eia additional third party correspondance 17-08-2015.pdf
public 03 nym2014-0587-eia additional third party correspondence -1 19-08-2015.pdf
public 03 nym2014-0587-eia additional third party correspondence 18-08-2015.pdf
public 03 nym2014-0587-eia additional third party correspondence 19-08-2015.pdf
public 03 nym2014-0587-eia additional third party representaions 13-08-2015.pdf
public 03 nym2014-0587-eia additional third party respresentations 07-08-2015.pdf
public 03 nym2014-0587-eia consultee responses including parish comments (updated 07 may 2015).pdf
public 03 nym2014-0587-eia third party representations - objections (updated 14 may 2015).pdf
public 03 nym2014-0587-eia third party representations - support.pdf
public 04 environment agency email correspondence (27-03-2015 and 01-04-2015).pdf
public 04 nym2014-0587-eia additional background information 1-05-2015.pdf
public 04 nym2014-0587-eia additional background information 12-05-2015.pdf
public 04 nym2014-0587-eia applicant correspondence 1-05-2015.pdf
public 04 nym2014-0587-eia s106 offer letter and area of influence 01-05-15.pdf
public 05 nym2014-0587-eia fsi part 01 - further supplementary information 17-06-2015.pdf
public 05 nym2014-0587-eia fsi part 02 - appendix 01 assessment of cumulative effects 17-06-2015.pdf
public 05 nym2014-0587-eia fsi part 02 - appendix 02 vop water injection seismic event risk assessment 17-06-2015.pdf
public 05 nym2014-0587-eia fsi part 02 - appendix 03 em water injection seismic event risk assessment 17-06-2015.pdf
public 05 nym2014-0587-eia seismic event ra cumulative effect of multiple nym water injection sites 03-07-2015.pdf
public 05 nym2014-0587-eia technical note review of further supplementary information 09-07-2015.pdf
public 23428 chapter 14 economics_final.pdf
public 23428 chapter 10 air quality_final.pdf
public 23428 chapter 11 flood risk & drainage_final.pdf
public 23428 chapter 12 produced water disposal_final.pdf
public 23428 chapter 13 cultural heritage_final.pdf
public 23428 chapter 15 ground conditions_final.pdf
public 23428 chapter 16 summary_final.pdf
public 23428 chapter 2 eia methodology_final.pdf
public 23428 chapter 4 alternatives_final.pdf
public 23428 chapter 6 ecology final.pdf
public 23428 chapter 7 lvia_final.pdf
public 23428 ems knapton appendix 7.1 lvia methodology.pdf
public 23428 ems knapton appendix 7.2 baseline photography.pdf
public 23428 ems knapton appendix 7.4 north york moors national park design guide.pdf
public 23428 ems knapton appendix 7.5 landscape character extracts.pdf
public 23428 ems knapton appendix 7.6 visual effects table.pdf
public 23428 ems knapton apppendix 7.3 woody vegetation.pdf
public 23428 es chapter 1 introduction_final.pdf
public 23428 es chapter 3 site development description_final.pdf
public 23428 es chapter 5 construction_ final.pdf
public 23428 es chapter 8 traffic_final.pdf
public 23428 es chapter 9 noise_final.pdf
public 23428 es contents & cover - appendices.pdf
public 23428 es contents & cover- main text and figures.pdf
public 23428 figure 1.1 p010 site location-a3.pdf
public 23428 figure 14-1 site location plan.pdf
public 23428 figure 2.1 e003 cumulative schemes-a3.pdf
public 23428 figure 3.1 site boundary-a1.pdf
public 23428 figure 3.2 existing site plan.pdf
public 23428 figure 3.3 proposed site plan.pdf
public 23428 figure 3.4a-n strip plans.pdf
public 23428 figure 3.6b pipe section dalby forest.pdf
public 23428 figure 3.7-p_06_proposed parameter plan.pdf
public 23428 figure 3.8 proposed parameter sections.pdf
public 23428 figure 5.1 construction parameter plan.pdf
public 23428 figure 5.2 contruction parameter section.pdf
public 23428 figures 7.1 - 7.10.pdf
public 23428 nts_final.pdf
public appendix 11.1 sequential test.pdf
public appendix 12.1 - bibliography.pdf
public appendix 12.2.pdf
public appendix 12.3.pdf
public appendix 13.1 dba.pdf
public appendix 13.2 geophysical survey.pdf
public appendix 15.1 envirocheck and groundsure report.pdf
public appendix 2.1.pdf
public appendix 5.1 parameter table_june 2014 + nmd +ld.pdf
public appendix 5.2 water production well description.pdf
public appendix 8.1 cover page.pdf
public appendix 8.1 traffic survey june 2014.xlsm
public appendix 8.2 cover page.pdf
public appendix 8.2 traffic survey mayjune 2013.xls
public appendix cover page_12.2.pdf
public appendix cover page_12.3.pdf
public application site boundary.pdf
public confirmation of extension to consultation period.pdf
public dalby forest pipeline cross section.pdf
public design and access statement.pdf
public ems - knapton pipeline appendix 6.1 final bap.pdf
public ems - knapton pipeline appendix 6.2 final ratcliffe.pdf
public ems - knapton pipeline appendix 6.3 final desk study_combined.pdf
public ems - knapton pipeline appendix 6.4 final target notes.pdf
public ems - knapton pipeline appendix 6.5 final hsi.pdf
public ems - knapton pipeline appendix 6.7 final brp.pdf
public ems - knapton pipeline appendix 6.8 final hedgerows.pdf
public ems - knapton pipeline appendix 6.9 final report to inform hra screeing.pdf
public ems well site - existing sections.pdf
public ems well site - existing site plan.pdf
public ems well site - location plan.pdf
public ems well site - proposed aerial view.pdf
public ems well site - proposed elevations.pdf
public ems well site - proposed sections.pdf
public ems well site - proposed site plan.pdf
public es_figure_13.1_04-08-14.pdf
public es_figure_13.2_04-08-14.pdf
public existing gas reception module - end elevation.jpg
public existing gas reception module - side elevation.jpg
public figure 6.1.pdf
public figure 6.2- sheet 1.pdf
public figure 6.2- sheet 2.pdf
public figure 6.2- sheet 3.pdf
public figure 6.2- sheet 4.pdf
public figure 6.3- sheet 1.pdf
public figure 6.3- sheet 2.pdf
public figure 6.3- sheet 3.pdf
public figure 6.3- sheet 4.pdf
public fig 11.1 aquifer solid deposits.pdf
public fig 11.2 groundwater spz.pdf
public fig 11.3 groundwater vulnerability.pdf
public fig 11.4 groundwater drinking water protected areas.pdf
public fig 11.5 flood risk.pdf
public fig 11.6 catchment areas.pdf
public fig 11.7 geo plan.pdf
public fig 11.8 river basin management.pdf
public fig 8.1 major access routes.pdf
public fig 8.10 ebberston junction swept path.pdf
public fig 8.2 proposed site traffic routes.pdf
public fig 8.3 proposed site traffic route (north).pdf
public fig 8.4 proposed site traffic route (south).pdf
public fig 8.5 proposed a170 traffic control.pdf
public fig 8.6 swept paths on malton lane.pdf
public fig 8.7 footpath diversion south of wilton ings lane.pdf
public fig 8.8 proposed layby on penniston lane.pdf
public fig 8.9 snainton junction swept path.pdf
public figure 10.1_v5_final.pdf
public figure 10.3.pdf
public figure 12.1.pdf
public figure 12.2.pdf
public figure 12.3.pdf
public figure 15.1 generalised geology plan overview and key.pdf
public figure 15.2 generalised geology plan.pdf
public figure 15.3 generalised geology plan.pdf
public figure 15.4 generalised geology plan.pdf
public figure 15.5 generalised geology plan.pdf
public figure 15.6 generalised geology plan.pdf
public figure 15.7 generalised geology plan.pdf
public figure 15.8 generalised geology plan.pdf
public figure 15.9 generalised geology plan.pdf
public figure 3.5a - kgs plot planv2.pdf
public figure 3.5b - existing gas reception module.pdf
public figure 3.6a - typical indicative pipeline cross section.pdf
public figure 9.1.pdf
public figure 9.2.pdf
public figure10.2_v5_final.pdf
public footpath diversion south of wilton ings lane.pdf
public gas extraction location plan.pdf
public kgs - gas reception module.pdf
public kgs - plot plan.pdf
public location plan.pdf
public nycc covering letter.pdf
public nym2014-0587-eia decision notice.pdf
public nymnpa covering letter.pdf
public outline safety document.pdf
public planning application drawing schedule.pdf
public planning application form.pdf
public planning history (continued from app form).pdfx
public planning strip plans - sheets 1-12.pdf
public planning and sustainability statement.pdf
public proposed a170 traffic control.pdf
public proposed layby on penniston lane.pdf
public statement of community involvement.pdf
public typical indicative pipeline cross section.pdf
public _confirmation of extension to consultation period.pdf
public _correspondence regarding planning application meeting.pdf